« Tilbage til oversigten over alle licitationer
Danmark-Fredericia: Højspændingsmaster
2023/S 130-414599
Udbudsbekendtgørelse – forsyningsvirksomhed
Varer
Del I: Ordregivende enhed
CVR-nummer: 39314878
Postadresse: Tonne Kjærsvej 65
By: Fredericia
NUTS-kode: DK Danmark
Postnummer: 7000
Land: Danmark
Kontaktperson: Procurement - A
E-mail: procurement@energinet.dk
Telefon: +45 70102244
Internetadresse(r):
Overordnet internetadresse: https://eu.eu-supply.com/ctm/supplier/publictenders?B=ENERGINET
Internetadresse for køberprofilen: https://eu.eu-supply.com/ctm/Company/CompanyInformation/Index/228008
Del II: Genstand
Framework agreement for lattice towers
8 years framework agreement for procurement, production and delivering of lattice towers to Denmark – DK. 4 (four) companies will be selected to the framework agreement.
Lot 1: Delivery of galvanized lattice towers in the range of 15 to 65 meter in height for overhead lines within the range of 100 to 400 kV. Order size from 100 to 4000 ts. pr. order.
All over Denmark
Delivery of galvanized lattice towers in the range of 15 to 65 meter in height for overhead lines within the range of 100 to 400 kV. Order size from 100 to 4000 ts. pr. order for lot 1 Towers are mainly for replacement of old towers, but new tower designs can be included. Building information modeling (BIM) will be part of the delivery. Old towers need to be redrawn in 3D based on old drawing with minor adjustments before production. Export to. skp format will be positive. For new towers 3D model will be provided. In general documentation is important including assembling and installation methods.
Old towers are designed based on European steel quality and need to be replaced with the same quality.
Galvanizing quality is important because of near coast environment. Precise and good quality production is therefore also important to prevent redrilling of holes on site. Easy access to Type and FAT is important to guarantee the quality.
Delivery will be on site ore at central storage and be different from each mini tender. Packing of materiel for transport and handling is important to prevent damage on surface, and to sure safe handling also for unloading and eventually emptying of containers.
If more than 6 applicants fulfill the minimum requirements, cf. section III, the Contracting Authority will prequalify the 6 applicants who are evaluated as most qualified for the specific tendered assignment. Only these applicants will be invited to submit a tender. The selection of the applicants will be based on the relevance of the submitted references, cf. the scope stated in section II.2.4, and the extent to which the references overall demonstrate comprehensive experience with deliveries comparable to the tendered assignment regarding solution, complexity and scope, especially concerning:
• The steel norm references are based on
• BIM Information level of 3D drawing and format
• Surface treatment
• Voltage level of overhead line
• Delivery method
• Size and number of towers
• Place for Type and FAT
Lot 2: Delivery of galvanized lattice towers in the range of 15 to 65 meter in height for overhead lines within the range of 100 to 400 kV. Order size from 1 to 100 ts. pr. order.
All over Denmark
Delivery of galvanized lattice towers in the range of 15 to 65 meter in height for overhead lines within the range of 100 to 400 kV. 1 to 100 ton for lot 2. Towers are mainly for replacement of old towers, but new tower designs can be included. Building information modeling (BIM) will be part of the delivery. Old towers need to be redrawn in 3D based on old drawing with minor adjustments before production. Export to .skp format will be positive. For new towers 3D model will be provided. In general documentation is important including assembling and installation methods.
Old towers are designed based on European steel quality and need to be replaced with the same quality.
Galvanizing quality is important because of near coast environment. Precise and good quality production is therefore also important to prevent redrilling of holes on site. Easy access to Type and FAT is important to guarantee the quality.
Delivery will be on site ore at central storage and be different from each mini tender. Packing of materiel for transport and handling is important to prevent damage on surface, and to sure safe handling also for unloading and eventually emptying of containers.
If more than 6-8 applicants fulfill the minimum requirements, cf. section III, the Contracting Authority will prequalify the 6 applicants who are evaluated as most qualified for the specific tendered assignment. Only these applicants will be invited to submit a tender. The selection of the applicants will be based on the relevance of the submitted references, cf. the scope stated in section II.2.4, and the extent to which the references overall demonstrate comprehensive experience with deliveries comparable to the tendered assignment regarding solution, complexity and scope, especially concerning:
• The steel norm references are based on
• BIM Information level of 3D drawing and format
• Surface treatment
• Voltage level of overhead line
• Delivery method
• Size and number of towers
• Place for Type and FAT
Del III: Juridiske, økonomiske, finansielle og tekniske oplysninger
The applicant must confirm the economic ability in the ESPD part IV.B: “Economic and financial standing” with information from the latest annual report regarding the following economic indicators:
1. Equity (total equity incl. share capital, reserves, revaluation, retained earning etc.)
2. Equity ratio (equity/total assets). This must be stated with two decimals.
If the applicant is relying on the capacities of one or more other entities (e.g. a parent or sister company or a subcontractor) or the applicant is a group of economic operators (e.g. a consortium) the information for the ESPD part IV.B must also be given in a separate ESPD from each of these entities, cf. section VI.3 “Additional information”. It is the sole responsibility of the applicant to secure that the minimum level(s) of standards required are reached on the basis of consolidation when the applicant is relying on the capacity of other entities or when the applicant is a group of economic operators (e.g. a consortium).
Lot 1:
Concerning 1: Equity from the latest annual report must, at the time of prequalification, be at least 4,500,000.00 EUR.
Concerning 2: Equity ratio from the latest annual report must be at least 20 pct. If the equity ratio is between 15 pct. and 20 pct.
Lot 2:
Concerning 1: Equity from the latest annual report must, at the time of prequalification, be at least 450,000.00 EUR.
Concerning 2: Equity ratio from the latest annual report must be at least 20 pct. If the equity ratio is between 15 pct. and 20 pct.
The applicant must include the up to 5 most comparable and relevant references undertaken in the past three (3) years as part of the application. The references must be stated in the ESPD part IV.C: “Technical and professional ability”. Undertaken in the past three (3) years implies that the reference must not have been completed prior to the date reached when counting 3 years backwards from the submission date for prequalification. References older than this will not be taken into consideration. References which have not yet been fully completed can be included as part of the application, but if this is the case, the applicant must describe the parts which have not yet been delivered, and this may affect the evaluation of the applicant, cf. section II.2.9.
The references for lot 1 should include:
1. A specific description of the work performed for each reference, including:
Three references including deliveries of minimum 100 lattice towers with a total weight more than 2000 ton. The deliveries shall be based on European steel quality EN10056.
One references with 3D modeling of new towers based on old 2D drawings from the client. Client is the purchaser of the tower.
2. Contact information for the entity in question (including contact person)
3. Date of initiation and final delivery (day, month, year)
The references for lot 2 should include:
1. A specific description of the work performed for each reference, including:
Three references including deliveries of minimum 2 lattice towers with a total weight more than 20 ton. The deliveries shall be based on European steel quality EN10056.
One references with 3D modeling of new towers based on old 2D drawings from the client. Client is the purchaser of the tower.
2. Contact information for the entity in question (including contact person)
3. Date of initiation and final delivery (day, month, year)
Any ambiguities and/or incomprehensibilities concerning the above information may have a negative effect on the selection of candidates, cf. section II.2.9. Please note the “description” box can contain more text than is visible. I.e. it is possible to copy paste text into the box.
If the applicant is relying on the references of one or more other entities (e.g. a parent or sister company or a subcontractor) or the applicant is a group of economic operators (e.g. a consortium) the information for the ESPD part IV.C must also be given in a separate ESPD from each of these entities.
The number of references should not surpass a maximum of the 5 most comparable and relevant references. If the applicant is relying on the capacity of one or more other entities (e.g. a parent or sister company or a subcontractor) or the applicant is a group of economic operators (e.g. a consortium) the maximum number of references to be submitted must still be respected and cannot exceed 5 when combined. If more than 5 references are included, the Contracting Authority will only consider the 5 most recent references determined by date of final delivery (in this case not yet finished references will not be included).
The applicant must submit a completed version of the ESPD.
Applicants may not be subject to the mandatory grounds for exclusion, cf. the Danish Public Procurement Act (udbudsloven) Section 134a, 135 (1-3) and 136.
Please see section VI.3 “Additional information” for further information regarding the ESPD. The application must be submitted through EU-Supply, cf. link in section I.1 in this TED announcement. Applications not submitted via EU-supply or received after the deadline will not be accepted.
The Contracting Authority reserves the right to request the applicant to supplement, specify or complete the information submitted.
The information is stated in the Tender Documents.
The information is stated in the Tender Documents.
The information is stated in the Tender Documents.
The information is stated in the tender material.
Del IV: Procedure
Del VI: Supplerende oplysninger
The applicant must submit a completed ESPD to apply for prequalification for this tender procedure. The ESPD for this tender can be found via EU-supply. The ESPD must be completed in EU-Supply and submitted via “My Response”. A guide to the ESPD can be found on the webpage of the Competition and Consumer Authority (www.KFST.dk) in Danish (the Contracting Authority is not responsible for the content of the guide).
Please note:
- An applicant participating on its own, but relying on the capacities of one or more other entities (e.g. a parent or sister company or a subcontractor), must ensure that the application includes the applicants own ESPD together with a separate ESPD from each of the entities it relies on with a completed part II: “Information concerning the economic operator” and part III: “Exclusion grounds” of the ESPD as well as the relevant information regarding part IV: “Selection criteria” and part V: “Reduction of the number of qualified candidates”. The ESPD from each of the entities should be duly filled and signed by the entities concerned.
Further where an applicant wants to rely on the capacities of other entities, it shall prove to the contracting authority that it will have at its disposal the resources necessary, for example, by producing a commitment by those entities to that effect, which must be submitted as part of the final documentation.
- Where groups of economic operators, including temporary associations, participate together in the procurement procedure, a complete separate ESPD for each of the participating economic operators must be submitted.
Further the final documentation must include a signed declaration by all parties of the group of economic operators (joint venture, consortium or other) stating that all economic operators assume joint and several liabilities towards the Contracting Authority for the performance of the contract as a whole.
Postadresse: Nævnenes Hus, Toldboden 2
By: Viborg
Postnummer: 8800
Land: Danmark
E-mail: klfu@naevneneshus.dk
Telefon: +45 72405708
Internetadresse: https://naevneneshus.dk/start-din-klage/klagenaevnet-for-udbud/
Complaints regarding a candidate not being pre-qualified must be filed with The Complaints Board for Public Procurement within 20 calendar days starting the day after the contracting authority has sent notification to the candidates involved, provided that the notification includes a short account of the relevant reasons for the decision.
Other complaints must be filed with The Complaints Board for Public Procurement within:
1. 45 calendar days after the contracting authority has published a contract award notice in the Official Journal of the European Union (with effect from the day following the publication date);
2. 30 calendar days starting the day after the contracting authority has informed the tenderers in question, that the contracting authority has entered into a contract based on a framework agreement through reopening of competition or a dynamic purchasing system, provided that the notification includes a short account of the relevant reasons for the decision;
3. 6 months starting the day after the contracting authority has sent notification to the candidates/tenderers involved that the contracting authority has entered into the framework agreement, provided that the notification included a short account of the relevant reasons for the decision.
Postadresse: Carl Jacobsen Vej 35
By: Valby
Postnummer: 2500
Land: Danmark
E-mail: kfst@kfst.dk
Telefon: +45 41715000
Internetadresse: http://www.kfst.dk