« Tilbage til oversigten over alle licitationer


193/2024
595751-2024 - Planlægning
Danmark – Byggearbejder i forbindelse med jernbaner – M5 Transportation Systems Market Dialogue
OJ S 193/2024 03/10/2024
Forhåndsmeddelelse eller vejledende periodisk bekendtgørelse, der kun er anvendt til informationsformål
Bygge- og anlægsarbejder
1. Køber
1.1.
Køber
Officielt navn: Metroselskabet I/S
E-mail: vij@m.dk
Køberens retlige status: Offentligretligt organ
Den ordregivende myndigheds aktivitet: Generelle offentlige tjenesteydelser
Den ordregivende enheds aktiviteter: Bytransport med jernbane, sporvogn, trolleybus eller bus
2. Procedure
2.1.
Procedure
Titel: M5 Transportation Systems Market Dialogue
Beskrivelse: M5 is a new metro line that will connect the new city development areas to the east of Copenhagen, including Lynetteholm, Refshaleøen and Kløverparken, with the existing city and transport network. M5 will include a new Control and Maintenance Centre (CMC). The M5 alignment shall be underground from CMC via Lergravsparken to the end shaft at Vester Søgade, and from Lergravsparken to v/Prags Boulevards Øst. The alignment shall transition from underground to elevated via ramp just north of v/Prags Boulevards Øst and be elevated from the ramp to v/Refshaleøen. Metroselskabet expects to build the stretch from Copenhagen Central Station to Prags Boulevard to open in 2035. The part from v/Ref to Kk is planned to open in 2045 and is not part of the upcoming tender for a contractor. However, the Transportation systems will be designed so that they can cover – or be expanded to cover – from København H to Østerport and possible also the full ring and other scenarios that are safeguarded for. Additionally, the branch to the CMC is underground with a Bifurcation located near Jenagade or in connection to the station Lergravsparken, the alignment has a ramp to surface on Prøvestenen. The alignment is currently being developed by a civil works consultant (a joint venture consisting of COWI and ARUP) to make it possible to extend the line/close the ring from Østerport (Kk) and København H (Kh). Also, a joint venture consisting of Rambøll and Systra Denmark has joined the project as Transportation Systems consultants. With the new M5 line, Metroselskabet will be focusing on improving other aspects of future metro lines. Using the UNSDGs as a basis, four main project objectives have been defined with the objective to minimize negative impact and maximising the positive impact of the project. • Reduce the use of resources and climate impact Metroselskabet has an ambition to reduce the carbon footprint from future metro lines with 50% compared to the existing metro. • Improve passenger experience and operational robustness The Copenhagen metro run with a low amount of carbon pr. Passenger kilometer, mainly because it is electrically powered, and many people prefer to use the metro when using public transportation. Operational robustness and reliable service is therefore an essential aspect of sustainability. • Improve safety and working environment Everyone should be able to work without accidents or injuries, both in construction and operations of the new metro line. • A contribution to the city A new metro line should physically meet and connect with the city in a way that creates urban space quality and leave space for increased urban biodiversity. In order, to ensure that the Transportation Systems construction contract is attractive to the market, Metroselskabet will be conducting a market dialogue prior to releasing the tender for the transportation systems construction contract. Thus, Metroselskabet invites potential interested parties to sign up for market dialogue meetings. The meetings will be individual meetings, and the meeting can be either in person at Metrovej 5, Copenhagen or via TEAMS or a hybrid depending on the preferences of potential interested party. The dialogue meetings will take place during November 11th to November 22nd 2024. Please contact: vij@m.dk if you wish to participate in a dialogue meeting.
2.1.1.
Formål
Kontraktens hovedformål: Bygge- og anlægsarbejder
Primær klassifikation (cpv): 45234100 Byggearbejder i forbindelse med jernbaner
Supplerende klassifikation (cpv): 45234129 Bygge- og anlægsarbejde i forbindelse med anlæg af bybaner, 45234111 Anlægsarbejde: bybaner, 45234116 Sporlægningsarbejder, 42961200 Scada eller tilsvarende system, 31174000 Strømforsyningstransformatorer
2.1.2.
Udførelsessted
Postadresse: Metrovej 5  
By: København S
Postnummer: 2300
Landsdel (NUTS): Byen København (DK011)
Land: Danmark
2.1.4.
Generelle oplysninger
Retsgrundlag: 
Direktiv 2014/25/EU
3. Del
3.1.
Del: PAR-0001
Titel: M5 Transportation System and Operation and Maintenance Market Dialogue
Beskrivelse: M5 is a new metro line that will connect the new city development areas to the east of Copenhagen, including Lynetteholm, Refshaleøen and Kløverparken, with the existing city and transport network. M5 will include a new Control and Maintenance Centre (CMC). The M5 alignment shall be underground from CMC via Lergravsparken to the end shaft at Vester Søgade, and from Lergravsparken to v/Prags Boulevards Øst. The alignment shall transition from underground to elevated via ramp just north of v/Prags Boulevards Øst and be elevated from the ramp to v/Refshaleøen. Metroselskabet expects to build the stretch from Copenhagen Central Station to Prags Boulevard to open in 2035. The part from v/Ref to Kk is planned to open in 2045 and is not part of the upcoming tender for a contractor. However, the Transportation systems will be designed so that they can cover – or be expanded to cover – from København H to Østerport and possible also the full ring and other scenarios that are safeguarded for. Additionally, the branch to the CMC is underground with a Bifurcation located near Jenagade or in connection to the station Lergravsparken, the alignment has a ramp to surface on Prøvestenen. The alignment is currently being developed by a civil works consultant (a joint venture consisting of COWI and ARUP) to make it possible to extend the line/close the ring from Østerport (Kk) and København H (Kh). Also, a joint venture consisting of Rambøll and Systra Denmark has joined the project as Transportation Systems consultants. With the new M5 line, Metroselskabet will be focusing on improving other aspects of future metro lines. Using the UNSDGs as a basis, four main project objectives have been defined with the objective to minimize negative impact and maximising the positive impact of the project. • Reduce the use of resources and climate impact Metroselskabet has an ambition to reduce the carbon footprint from future metro lines with 50% compared to the existing metro. • Improve passenger experience and operational robustness The Copenhagen metro run with a low amount of carbon pr. Passenger kilometer, mainly because it is electrically powered, and many people prefer to use the metro when using public transportation. Operational robustness and reliable service is therefore an essential aspect of sustainability. • Improve safety and working environment Everyone should be able to work without accidents or injuries, both in construction and operations of the new metro line. • A contribution to the city A new metro line should physically meet and connect with the city in a way that creates urban space quality and leave space for increased urban biodiversity. In order, to ensure that the Transportation Systems construction contract is attractive to the market, Metroselskabet will be conducting a market dialogue prior to releasing the tender for the transportation systems construction contract. Thus, Metroselskabet invites potential interested parties to sign up for market dialogue meetings. The meetings will be individual meetings, and the meeting can be either in person at Metrovej 5, Copenhagen or via TEAMS or a hybrid depending on the preferences of potential interested party. The dialogue meetings will take place during November 11th to November 22nd 2024. Please contact: vij@m.dk if you wish to participate in a dialogue meeting.
3.1.1.
Formål
Kontraktens hovedformål: Bygge- og anlægsarbejder
Primær klassifikation (cpv): 45234100 Byggearbejder i forbindelse med jernbaner
Supplerende klassifikation (cpv): 45234000 Arbejder i forbindelse med anlæg af jernbaner og kabelbaner
Supplerende klassifikation (cpv): 45234111 Anlægsarbejde: bybaner
Supplerende klassifikation (cpv): 45234129 Bygge- og anlægsarbejde i forbindelse med anlæg af bybaner
Supplerende klassifikation (cpv): 45234111 Anlægsarbejde: bybaner
Supplerende klassifikation (cpv): 45234116 Sporlægningsarbejder
Supplerende klassifikation (cpv): 42961200 Scada eller tilsvarende system
Supplerende klassifikation (cpv): 31174000 Strømforsyningstransformatorer
3.1.2.
Udførelsessted
Landsdel (NUTS): Byen København (DK011)
Land: Danmark
3.1.5.
Generelle oplysninger
Reserveret deltagelse: 
Deltagelse uden forbehold.
Udbuddet er omfattet af aftalen om offentlige udbud (GPA): ja
3.1.8.
Teknikker
Rammeaftale: 
Ingen rammeaftale
3.1.9.
Yderligere oplysninger, mægling og gennemgang
Organisation med ansvar for klager: Metroselskabet I/S - Danish Complaint Board for Public Procurement
Organisation, der leverer yderligere oplysninger om klageprocedurerne: Metroselskabet I/S - Danish Consumer and Competition Agency
8. Organisationer
8.1.
ORG-0001
Officielt navn: Metroselskabet I/S
Registreringsnummer: 30823699
Postadresse: Metrovej 5
By: København S
Postnummer: 2300
Landsdel (NUTS): Byen København (DK011)
Land: Danmark
Enhed: Vibeke Jessen
E-mail: vij@m.dk
Telefon: 72424802
Internetadresse: www.m.dk
Andre kontaktpunkter: 
Officielt navn: Danish Complaint Board for Public Procurement
Postadresse: Toldboden 2  
By: Viborg
Postnummer: 8800
Landsdel (NUTS): Nordjylland (DK050)
Land: Danmark
Telefon: 72 40 56 00
Internetadresse: www.klfu.dk
Andre kontaktpunkter: 
Officielt navn: Danish Consumer and Competition Agency
Afdeling: Metroselskabet I/S
Postadresse: Carl Jacobsens Vej 35  
By: Valby
Postnummer: 2500
Landsdel (NUTS): Byen København (DK011)
Land: Danmark
E-mail: kfst@kfst.dk
Telefon: 4171 5000
Internetadresse: www.kfst.dk
Denne organisations roller: 
Køber
Organisation med ansvar for klager
Organisation, der leverer yderligere oplysninger om klageprocedurerne
8.1.
ORG-0000
Officielt navn: Publications Office of the European Union
Registreringsnummer: PUBL
By: Luxembourg
Postnummer: 2417
Landsdel (NUTS): Luxembourg (LU000)
Land: Luxembourg
Telefon: +352 29291
Internetadresse: https://op.europa.eu
Denne organisations roller: 
TED eSender
Oplysninger om bekendtgørelsen
Bekendtgørelsens ID: 2d551d4a-fa89-4691-97e2-1f159fa09b4a  -  01
Formulartype: Planlægning
Bekendtgørelsestype: Forhåndsmeddelelse eller vejledende periodisk bekendtgørelse, der kun er anvendt til informationsformål
Bekendtgørelsesundertype: 5
Afsendelsesdato for bekendtgørelsen: 02/10/2024 08:12:44 (UTC+00:00) vesteuropæisk tid, GMT
Bekendtgørelsens officielle sprog: engelsk
Bekendtgørelsesnummer: 595751-2024
EUT-S-nummer: 193/2024
Offentliggørelsesdato: 03/10/2024

« Tilbage til oversigten over alle licitationer